RE: ENI offtake?19 Jun 2019 12:45
right Woody, so you can't really say I'm underestimating things then.
I have a fairly good understanding of the topside of things. That is relatively easy. If the djeno is surfacing under it's own pressure, all we need is some tanks (at 2,000 bbopd some 2*200 cbm will be enough but 2*1000 cbm would be better as caters for future but may be harder to get short term!), some piping, some controls, pumps and loading rack. Would one need a weighbridge out there? Maybe some venting/scrubbing equipment as it's oil. Surely you can get all that locally. USD 0.6 mln? I could look up the detail but should be more than enough.
The more vague for me is the 'well workover' as I'm not expecting we will drill into the djeno from 103. That is where the difference is maybe. That is where I refer to the resident experts here.
It won't be cheap but several mln seems to me very well achievable for us. SNPC already handed over USD3.2 mln and we had the 6 mln placing in Jan. We must have spent some of that indeed but I would expect at least half of that to be still available. With some payments coming our way and not paying for all works in advance I think we are there.
Again, happy to be corrected.
MS