RE: ........................16 Jul 2018 07:48
Lol BigBear...testing this.....and so i don't think you'll be short for too long, or you'll run the risk of financial ruin....ho ho ho ;-)
16/2/16
UK Oil & Gas Investments PLC (London AIM and ISDX: UKOG) announces that Horse Hill Developments Limited has informed the Company that light, 40-degree API, sweet oil has flowed naturally to surface from an 80-foot zone within the Lower Kimmeridge limestone interval at a depth of approximately 900 metres below ground level.
Flow commenced at around 10.00am GMT yesterday at an initial instantaneous rate in excess of 700 barrels per day using a 1-inch choke, in an approximate mix of 50:50 oil to water. The well was then choked back to 32/64 inches resulting in a steady early oil rate in excess of 463 barrels of oil per day over a further 7.3-hour period, in an approximate mix of over 99% oil and less than 1% water.
1/3/16
UKOG) announces that Horse Hill Developments Limited ("HHDL") has informed the Company that 100% dry, 40-degree API, light, sweet oil has flowed freely to surface, without pumping, at an average stabilised rate in excess of 900 barrels per day from an 88-foot aggregate perforated zone within the Upper Kimmeridge limestone interval at a depth of approximately 840 metres below ground level.
Restricted flow of 100% dry oil, through a 1-inch choke, using a rod pump, commenced at around 1350 hrs GMT yesterday at an initial instantaneous rate in excess of 700 barrels per day ("bopd"). At circa 1430 hrs the well started flowing freely to surface, without pumping. The free flow rate increased to over 900 bopd at 1500 hrs. The flow of dry oil then stabilised from 1500 hrs to approximately 1800 hrs, at rates averaging in excess of 900 bopd.
Note that as a consequence of flow initialisation via rod pump, the initial natural flow rates stated above were further restricted by the rods within the 2 and 7/8-inch production tubing.
21/3/16
UK Oil & Gas Investments PLC (London AIM and ISDX: UKOG) announces that Horse Hill Developments Ltd has informed the Company that the final Horse Hill 1 ('HH-1') Portland test flowed at a stable dry oil rate of 323 barrels of oil per day ('bopd'), double the previously reported rate. The final total aggregate stable dry oil flow rate from two Kimmeridge limestones plus the overlying Portland sandstone stands at 1688 bopd. Over the 30-90 hour flow periods from each of the 3 zones, no clear indication of any reservoir pressure depletion was observed.