RE: positive16 Sep 2019 20:25
AJ: For the next 12 months Block ARE in the exploration phase, much the same as MATD. The costing shown are up March 2020
Question: hang on a sec, so you are saying the programme is only funded up until the exploration period that is planned to end by March 2020. If that is the case, then they will start to eat into the 12million if they haven't already done so?
Block are already working on Their Storage and Gas metering station, pipe line connections from WR38Z, WR03 and wr16aZ back to Blocks storage area which is under construction.
Conclusion: it is under construction, so basically they have only begun working on it. That sound like last minute planning to me and delays and other things can happen along the way which I will not go into deeply here.
Btw, Matd have already been granted permission to use PetroChina's "already built" spare oil storage compacity and they are just 1km away.