RE: tecc3 May 2023 21:10
"The reopening of the Rough gas storage facility ahead of the winter will further strengthen the UK’s energy resilience"
The UK has diverse gas supplies with connections with Norway and other European countries and a number of LNG import terminals. However, it still has some of the lowest levels of gas storage in Europe at 9 days, compared to Germany at 89 days, France at 103 days and the Netherlands at 123 days. The flexibility in Rough allows cheaper gas to be stored ready for winter, helping to reduce or stabilise costs for UK energy consumers.
Centrica Group Chief Executive, Chris O’Shea, said “I’m delighted that we have managed to return Rough to storage operations for this winter following a substantial investment in engineering modifications. Our long-term aim remains to turn the Rough field into the world’s biggest methane and hydrogen storage facility, bolstering the UK’s energy security, delivering a net zero electricity system by 2035, decarbonising the UK’s industrial clusters, such as the Humber region by 2040, and helping the UK economy by returning to being a net exporter of energy.