RE: Australian production of LCE tpa v Hydroxide plant 202431 Jan 2023 19:12
Tees Valley Lithium feedstock tonnage needs?
255,000tpa from ALL would produce approc 25,000tpa hydroxide. PLL have 50% bought in their deal already, but with Sayona NAL producing trial run now on the test production - 400 tons now crushed since 16 jan 2023, SYA are looking also at 200,000tpa = 25000tpa on full production, so ALL cannot supply there? The PLL 50% maybe stockpiled in the US until their Tenneessee hydroxide plant is up in 2025/26. So 50% is still up for grabs or 100,000=12500tpa hydroxide ?
"Atlantic's Ewoyaa property has a resource size of 30.1Mt (I&I) with an average grade of 1.26%. This past September, the company established its Maiden Reserve when it released a Prefeasibility Study in which it classified 18.9M of those tonnes as a Probable Reserve graded at 1.24%. And it plans to extract those 18.9Mt at a pace of 255ktpa over the next 12.5 years. The company will take the spodumene that it mines from Ewoyaa, concentrate it to a level of 6%, and sell that SC6 to both Piedmont and international markets. It's as simple as that."