RE: Eua27 Mar 2021 13:32
Nonsense, they've already been looked at by Eurasia -
"Each of the four open pit deposits, which are located directly adjacent to Monchetundra, have already been studied by Eurasia with block modelling and open pits' optimisations performed by the Company. According to the due diligence done by Eurasia, the ores are suitable for toll treatment over distances of 5 to 8km with beneficiation and mineral processing at the proposed plant site between the Company's open pit deposits at Loipishnune and West Nittis.
· A further five mostly open pit palladium, platinum, copper, nickel and cobalt assets are included in the JV, where Eurasia has carried out due diligence including c.20km of exploration drilling and some 12 thousand samples taken by Eurasia"
It's a open pit to production JV, hence the mention of using similar EPCF contracts to the one already in place with Sinosteel.
Some of you need to take the time to read the actual RNS before posting tbh.
GLA