RE: Leak?16 Jun 2022 15:09
Wacker,
I'm trying to remain optimistic, thinking that a delay is good in a way because they might be adding the final touches to the EPC; costing such a big, 5 year, project might have become more difficult due to the markets (commodity, materials, debt, equity, labour etc) going haywire due to the inflation and the volatility.
I'm saying "good delay" because if the EPC had collapsed due to the volatility etc, why would they delay the RNS announcing such a catastrophic outcome? Plus, the MM would drop the price by 50% or more anyway.
The super ideal scenario (me the wishful thinker) would be that the EPC has been already submitted (within deadline) and now the final touches are being added to the financing proposal - but this scenario is far fetched because there would have definitely been a leak and the SP would have risen already, not dropped.