Consent?3 Sep 2015 17:10
Someone on III posted this:
read para 4. 31 of the well consent.....
http://tinyurl.com/ptj2w8u
I had to download manually but the text in there may confirm this:
4.3 Papers 216/14 and 51/15 sought approval of the terms on which NEFL, as operator of various licences in the South Falkland Basin, should be issued with consent to drill various exploration wells scheduled for the 2015 offshore oil exploration campaign. The paper set out eight critical approvals required by NEFL for the company to secure consent to drill. NEFL met these requirements, secured consent to drill for the Humpback-1 exploration well, and that well spudded in June 2015.
4.4 At the time of original consideration, the opportunity for NEFL and Edison to farm in to the Argos licence had not matured. NEFL’s original intent was to drill a second well in the South Falkland Basin. As a result of the completion of the commercial farm-out process, NEFL and Edison now wish to drill an exploration well on the Rhea-1 prospect, targeting what is regarded by the joint venture as the best prospect within this newly acquired licence area. Drilling the Rhea well replaces the second well that NEFL intended to drill in their southern licence interest, to fulfil the two firm drilling commitments that NEFL hold with the Eirik Raude drilling rig.