We would love to hear your thoughts about our site and services, please take our survey here.
Unlikely imo :(
The state of emergency is not synonymous with lockdown. Rather, it is a legal framework that allows the Moroccan government to promptly take exceptional measures against COVID-19. The measures include lockdowns on neighborhoods or cities, bans on travel, the closing of gathering places, and the deployment of military troops in cities.
https://www.moroccoworldnews.com/2020/09/317827/morocco-extends-state-of-health-emergency-until-october-10/
Fully funded, including testing and wrestle.
Peeps watch the video yourself.
https://youtu.be/T9h1sjeGTsE
The video was only 5 weeks ago and not few months.
Listen from 4.20 onwards:
https://youtu.be/T9h1sjeGTsE
Courtesy of Mighty on twitter:
https://twitter.com/MightyBelle68/status/1301414562462228481
https://twitter.com/MightyBelle68/status/1301411919404789760
Once we have Stena confirm drill dates end of the year, we could then look at 3p and then personally hoping on 5p plus come spud imo
Just waiting patiently for Stena now.
Rossannan
I was more referring to the following:
'At any time after 1 September 2020 but prior to 1 November 2020, Stena must provide to BPC a commencement notice, which notice must specify: (i) the specific drilling rig to be deployed by Stena,
(ii) the location(s) which that drilling rig will be mobilised from / demobilized to, and
(iii) the date within the drilling window on which that drilling rig will arrive on location and be ready to commence drilling operations.'
Think we need to get news from Stena September for us to drill end of this year. However, if no news in September I think we could be looking at next year.
Let's see but I'm hoping peeps are adding sub 2p.
When do you guys see a realistic drilling timetable? Next summer?
In4cedros - Correct, I am aware of that. Stena need to advise from Sept to Nov about commencement and we will know then if drill will take place end of this year or next year.
This is why I said, we need confirmation ideally earlier the better ie sept so we can have the drill taking end of this year. Otherwise, if it's later ie just before November then we'll definitely looking at the latter part of the drilling window that has been mentioned.
Could do with Stena coming out in September to advise us that they plan to drill end of this year.
That will really get us moving.