RE: Summer Bank Holidays31 Aug 2020 22:21
Rossannan
I was more referring to the following:
'At any time after 1 September 2020 but prior to 1 November 2020, Stena must provide to BPC a commencement notice, which notice must specify: (i) the specific drilling rig to be deployed by Stena,
(ii) the location(s) which that drilling rig will be mobilised from / demobilized to, and
(iii) the date within the drilling window on which that drilling rig will arrive on location and be ready to commence drilling operations.'