RE: Over 1 hour12 Jun 2019 10:50
Gervaise Heddle, Chief Executive Officer, commented: "We are very pleased to have commenced field activities ahead of a drill programme that could begin to unlock the true potential of this project. The current programme is designed to test sections of the large chargeability anomaly, approximately 1,000 metres long, that was identified by the results of last year's 3DIP survey. Importantly, the results of that earlier survey illustrated that the existing sub-surface gold mineralisation identified by previous drilling at Firetower is spatially associated with the 3DIP anomaly."