RE: Why??19 Nov 2021 13:14
Boffo, that is why the share price did not rocket.
You are correct it is completed. So normally all of the costs would be updated as would the amount paid per tonne.
We would be looking at a business, probably worth as much as 500m, but definitely over 300m.
However, when they completed it spodumene 5 was worthless and was going to be left in the ground and our waste heaps.
Now spod 5 is worth 1,250 per tonne.
So Kodal are going back through their drilling samples and trying to work out how much spod 5 is on the land.
To separate spod 5 and spod 6 takes better equipment, with more cost, so they are spending six months to do their calculations and to let us know if we will be mining spod 5 as well as the original spod 6.