RE: 16.5m volume today26 Jan 2026 19:05
Also a silver project with silver now $115 too
rare earths, fluorspar, and gallium mineralisation. Since acquiring the project in June 2021, Altona has drilled over 7,800 metres, delivering a maiden JORC Mineral Resource Estimate of 13.6Mt at 2.42% TREO, secured a 25-year mining licence (granted December 2024), and published a Competent Person Report and scoping study for the rare earths component of the project (October 2023). The Company is actively engaging with the US Government, through USTDA, as a possible strategic partner to advance the rare earths project through the prefeasibility stage.
In parallel, Altona is progressing plans to fast-track the development of high-grade fluorspar veins identified along the western and southern margins of Monte Muambe, with a targeted production of 50,000 tonnes per annum of acid-grade fluorspar over a minimum 12-year mine life. Acid-grade fluorspar is a key input in a wide range of applications, including hydrofluoric acid, lithium battery electrolyte production, and nuclear fuel refining, placing Altona in a strong position to supply this critical material.
The discovery of gallium mineralisation, with grades up to 550 g/t identified to date, adds further value to Monte Muambe. The Company has established that gallium will be concentrated in fluorspar production tailings and is assessing its possible recovery as a by-product of fluorspar.
Altona's diversified portfolio also includes the Sesana Copper-Silver Project in Botswana, strategically located just 25 km from MMG's Khoemacau Zone 5 copper-silver mine. Situated on a recognised regional contact zone for copper deposits, Sesana represents a compelling exploration opportunity aligned with Altona's growth strategy.
With a unique combination of critical raw materials projects, Altona is well positioned to contribute to the global supply of highly sought commodities essential for clean energy, high technology, defence and industrial applications.