RE: September 2020 CPR1 Jul 2022 14:43
I believe the reason for the delay in the cpr is that chariot need to get audited the very low risk which chariot reported for the lixus licence prospects.
The annual report states.
“ Following the positive drilling results of 2022, additional exploration prospects within the Lixus licence area with similar seismic attributes to the Anchois discovery are now considered to be low risk. Accordingly, extensive work is ongoing to extrapolate the lessons learnt from drilling results and the application of seismic attribute analysis to de-risk and rank the follow-on portfolio. This work includes conventional seismic interpretation, revision of the depth model of the 3D dataset reprocessed in 2020, and advanced analysis such as AVO, seismic inversion and spectral decomposition”
All that work needs to be completed and audited, hence the delay.
I also think the cpr announcement will co incident with a farm out announcement.
Jimmy