RE: News by Christmas21 Nov 2020 16:45
This is from the website.
The Stage 2 expansion gives a 26-year mine life, generating cash flows after taxation of US$2.6 billion, with an estimated NPV of US$741 million and an IRR of 23.8% - using the base case nickel price forecast of $14,000/t. The second line will be financed through operational cash flow, meaning upfront capital cost remains at the same level at the FS Stage 1 of US$443 million.