RE: Egdon7 Oct 2025 10:37
UJO interims
KEDDINGTON OILFIELD - PEDL005(R) (55%)
The Keddington Oilfield is located along the highly prospective East Barkwith Ridge, an east-west structural high on the southern margin of the Humber Basin. During 2024 and the early part of 2025, a major upgrade of the site's production infrastructure was undertaken. Production recommenced during June 2025 and to date, over 3,000 barrels of high-quality oil have been produced and sold from Keddington. The newly installed equipment and facilities are working well and continue to be fine-tuned to optimise production. A technical review by the Operator has confirmed that there remains an undrained oil resource located on the eastern side of the Keddington field. Planning consent for further drilling is already in place, presenting an opportunity to increase production via a development side-track from one of the existing wells. To facilitate confirmation of the target definition and well design planning, re-processing of legacy 3D seismic data has been completed. The Operator's modelling indicates that infill drilling is forecast to improve recovery from the Keddington field by between 113,000 to 183,000 barrels of oil, depending on the reservoir permeability model selected and the combination of infill targets.
The sub-surface target of a step-out well has been identified and it is planned to drill the well, where planning consent is already granted, when macro-economic conditions are favourable.