RE: Result13 Dec 2019 10:42
CaptainStanley This was the last RNS on the subject. It is probably safe to say that some of the items can be ticked off, these included "HH-2z flow lines and ESP control cables will be connected, and the site's oil stock-tank storage capacity will also be significantly increased."
I would therefore have to agree with you.
27 November 2019
UK Oil & Gas PLC
("UKOG" or the "Company")
HH-2z Completed as Horse Hill's First Future Horizontal Oil Production Well
UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that its Horse Hill-2z ("HH-2z") Portland horizontal well (UKOG 85.635% net controlling interest) has been completed and temporarily suspended as a future oil-production well. HH-2z is now ready to enter into the planned extended well test ("EWT") campaign. EWT operations are expected to start in early December, once the rig has left the site.
Following displacement of drilling fluids to clean completion brine, well completion operations included: the installation of 4.5" diameter slotted steel liner, production tubing, a high-capacity/high-rate downhole electric submersible pump ("ESP") and a new wellhead. Immediately following rig departure, HH-2z flow lines and ESP control cables will be connected, and the site's oil stock-tank storage capacity will also be significantly increased.