RE: UKOG £400,000+ Per Month Income16 Feb 2020 15:30
Argus
Math is obviously not your strong point. 358ft is 109m not 200m. The interval between KL3 and KL4 was never perforated. Why not read the RNS's first before posting?
16 January 2019 KL4 production from a 103 ft perforated interval commenced during late November, yielding 2,192 bbl at a maximum half-hourly metered rate of 584 barrels of oil per day ("bopd") and at an average sustained daily continuous rate of 300 bopd over the subsequent week.
Fluid and pressure build up data gathered from the KL4 test demonstrate that the KL3 and KL4 are one single oil pool of 358 ft vertical extent. As a result, and as previously indicated, a decision was made to commingle both KL3 and KL4 production (i.e. produce from both sets of perforations at the same time).
Commingled KL3 and KL4 production from an aggregate 187 ft perforated interval commenced on 4th December at a maximum half-hourly rate of 426 bopd and continued throughout the Christmas and New Year period, producing 8,829 bbl of 40° API crude. The programme included several pressure build-up tests and testing of different pump configurations, settings and equipment.
Following the installation of a new downhole pump and an optimised surface hydraulic pump unit, stable commingled production resumed on 7th January at an increased initial rate of 525 bopd. The sustained daily rate over the subsequent week averaged 303 bopd. A de-waxing treatment applied on 14th January led to an increase in hourly rate to 351 bopd. Commingled production continues.