RE: Anatomy of the Leandra trial, a recap17 Jan 2025 13:05
AKHM...the POC takes 2 months as per the below in the RNS :
Following signature, the installation and commissioning of the Company's trial equipment at the MAC² terminal will commence, with fuel production and the 2-month Proof-of-Concept tests of MSAR® and bioMSAR™ expected to commence in Q1 2025. The bioMSAR™ LONO trial is planned to complete 6-8 months after the conclusion of the Proof-of-Concept tests.