RE: SP BEING SMASHED DOWN15 Jan 2021 12:10
Titan, didn't you say that the drill would never happen and that it was all a spoof to get a placing away?
Then you said that they would mess up the drill. Now you are trying to imply that because NTOG has not disclosed flow rates there is a problem. All very desperate on your part.
The well being put online was delayed by bad weather in East Texas. As indicated in the RNS the well was swabbed and flowed. However, the swabbed rate is not indicative of the flow rate when the well is put online. They need to flow the well for a couple of weeks before giving the flow rates.
If they gave a flow rate now you would be claiming it was misleading etc drivel, drivel, drivel.
The well is fine, it is online and producing. This means that the company should be able to confirm that it is cashflow positive shortly.
All very good news for the non-trolls.
DYOR