"In Namibia, operations at the Kavango West 1X discovery well are proceeding on schedule with the optimized zone production testing expected to commence early-to mid-May. The five-inch production liner has been set in the well bore which will allow zones to be isolated and tested sequentially. Perforating and testing of the six hydrocarbon bearing zones, ranging in thickness from 45-75 metres in both the Elandshoek and Huttenburg formations, will test approximately 420 metres of hydrocarbon saturated section. The production test, which is designed to determine hydrocarbon phase and deliverability, will be conducted in sequence from the deepest to the shallowest zone of interest. Testing of each zone could last up to 10 days, extending completion of the testing period to approximately the end of June."
Anyone know how far away May is?