RE: Check out Adam in Spain17 Jan 2023 23:47
Klunk,
It's just about the Power Tower not the fuelling strategy. Nowhere in the video does he mention any fuelling strategy, not Green Hydrogen, not Ammonia, not Methanol, despite all of those being in play prior to the test of the Fuel Tower.
Also, the Methanol Tower is likely still under development as it was a pilot test for it, so AB not mentioning after it had been there is no surprise to me.
Also, look at the weather, this looks like December weather for Cadiz to me, so I'd say weeks old not months old when it would have been blazing sunshine.
Power Tower online around 20 September 2022, a 3 month trial would complete on 20 December.
Methanol Tower successful on 7 November 2022
Miguel says 'THE ENTIRE DURATION OF THE PILOT' which means after 7 November minimum and after 20 December for a 3 month trial.
There's no way Miguel would have said 'THE ENTIRE DURATION OF THE PILOT' prior to testing the Methanol Tower, as at that point the trial would have still been running!