RE: It’s June11 Jun 2022 15:35
Kev,
I'm also anticipating an update on progress with building the 100kW S Series. Based on the timeline for delivery by year end, they must have done a considerable amount of work on it by mid year, and thus should update us.
From the 2021 final results RNS:
"The S Series platform is being accelerated through the ABB sale agreement, across each of the "air cooled" and "liquid cooled" platforms with early delivery of a 100kW liquid cooled system, and a 200kW liquid cooled system deployment, integrated with an ammonia cracker. It is this product platform which will form the basis of all larger scale, high power dense systems expected to be delivered across the S Series where ammonia or methanol are considered the low-cost hydrogen carriers of choice, including both data centres and maritime."
And from December 2021:
“S” Series development – utilising AEM (Anion Exchange Membrane) technology – continues apace, with the first prototype stack recently completed. Semi-automated manufacturing equipment has been commissioned and stack deliveries to ABB are expected in late 2022 (a 100kW system) and early 2023 (giving them 200kW system with integrated ammonia cracker)."
https://www.***************************/afc-energy-enormous-potential-for-products-in-data-centres-and-maritime-says-zeus-capital/4121039077