George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’. Watch the video here.
Another well substantiated statements to be buried with the thread. Apparently not a bot, just some fool who invested at the wrong time buying into some ramping on the back of KC's legendary timelines.
Here's some food for thought: KC is not actually privy to DFS details, like the locked cycle test. When and how that's done and released is up to the discretion of the majority owner of Geomet who contracted DRA. What KC thinks he recalls from memos he got from Geomet before he mumbles something ret*rded in an interview is irrelevant. What's relevant is that CEZ communicated their timeline with a Q4 DFS and FID "not long after that" and the Czech government is all in to make it work in terms is permits and value chain negotiations. If you think there's any doubt there will not be lithium mining in Cinovec soon, you're clearly not watching the same channel.
If you alude to a cheap buyout, that's something will have to wait and see - though being at the current bottom before the next big news, suggesting a return of pennies is a bit rich.
Anyhow, get better soon.
Https://hotcopper.com.au/documentembed?id=uOMxKKzFkiWRTLKhOROKAxjvTDYL4gm0yxjzv%2FJ097FiGug%3D
DFS still Q4 this year. No mention of the locked cycle test results though.