WOW29 Jul 2021 12:48
First completed hole of Phase 2 drill programme encountered well-developed copper mineralisation over approximately 120m length in angled hole BRDD-21-008
· Logging and core splitting is under way to prepare samples for assay
· Drilling of hole BRDD-21-007 is continuing from adjoining pad about 100m distant, with a third, steeper angled hole already under way from the first drill pad
Colin Bird, Executive Chairman said: "The Phase 2 drilling programme at the Racecourse deposit is now well under way at two sites. The first completed hole, BRDD-21-008, encountered strongly developed copper mineralisation, as anticipated. Drilling of the initial hole at the second drill pad is still continuing and we will report on this hole when completed. Work on site continues to progress rapidly and the third hole of the programme has already commenced."