RE: Stealth20 May 2019 09:52
L200 and STV
The FID was based on $245 per mtu for APT, the expected costs of production (at full production) within the FID was $94 per mtu, $245 minus $94 = $151 per mtu after production costs which is when multiplied by 20 tons or 20,000 mtu which equals $3million and $20,000 a month EBITDA