RE: Thomas MRE size15 Jun 2025 20:37
Actually it's 11.4km2
MRE Drilling Programme
The location and spacing of the planned AC drillholes have been designed, with the input of mineral resource consultants Snowden-Optiro, to provide the necessary drill assay data density to allow the preparation of an MRE at the Thomas Prospect. The programme consists of 124 AC drillholes, on a 400 x 200m drillhole-spaced grid with an average forecast depth of 54.1m, for a total of 6,700 metres, and 40 RC drillholes within the AC drilling grid, to a depth of 100m, for a total of 4,000 metres. The overall drillhole grid extends 5.2km by 2.2km and totals an area of 11.4 sq km (refer Figure 1).