Rabs10 Sep 2021 12:02
I suspect that the “formality” that can’t be unsigned, apparently, has been waiting for c6months thus far. The “days or weeks” once allegedly suggested by Pete was if accurate, evidently wishful bo((ocks and those various timings set out in the contract 90 days to set up post ratification for a September start have been ignored. A September start might still happen, but only if sufficient preps have been undertaken without the assurance of a contract in place. Or they could start operations without a contract, which eliminates any leverage on timing.
Pete’s judgement on “days, not weeks” was evidently unreliable once more, which is the reason that the market disregards BT output. I won’t be surprised if it’s still unratified at Christmas. We’ll see. Without it something else has got to be signed, installed and cheque in the post, PDQ.
I suspect if Pete’s (revised) attitude on timing is that it isn’t an issue on such a large, long term project, then Christmas may well win.
We’ll see. It’s Africa. He should know better by now.
I’m surprised that nobody asked Pete if ratification will warrant an RNS??