RE: Andrew Webley on the history books8 Aug 2018 18:55
The previous Jorc for M2 which admittedly needs redoing showed $500 million of inground copper.
The M2 infill recently showed grades of 2.59%.
They have the copper and likely a lot of it.
And some taking about delisting just because of a technicality in one drill hole not being able to penetrate through to the diorite. I would rather this be 50% down today compared with being as thick as pig****e.
Likely it will build again in anticipation plus due more news on m1, m2 and Jorc and m4