Racecourse Longsection18 Jan 2021 21:50
I've been looking at tge copper intersections on the drilling plan. Has anyone looked at how the copper intsections line upbwith the depths quoted and geology assumed from the surveys? Does the drill go inline with the crosssection or will it go further forward or backward at depth? Assuming the drill goes through the vertical cross sectiin tgen from the depths quoted it looks as if the coppwr inteesection on BRD008 should be higher up and more in line with the assumed geology. We don't appear to have a lot of specifics available on the drilling but would be curious to hear the thoughts from someone experienced in this area. It won't make a jot of difference to the SP but I'm curious...