RE: 33rd Licensing Round7 Sep 2023 07:58
Hi SE18, which public consultation are you talking about? If you are referring to the "Consultation on the Appropriate Assessments (AA) of Blocks applied for in the 33rd Seaward Licensing Round", I actually made a post on this a few days ago, but it probably drowned in the many other messages. I am repeating below just in case.
If you look at the 32nd round, the exact same process was applied to a subset of the blocks. In the worst case the individual areas could be excluded (unlikely though) or public servants will just adjust the reports but not change the conclusions or - most likely - it will just sail through with a box ticked (they have done their homework, as in the previous round). Again, this is not a general consultation on whether the round should go ahead; it is around specific issues such as impact on wildlife or plants from drilling activity, subsea pipes etc.
Repeat from 31 Aug 2023 17:38:
"Just drilled a bit further into the public consultation topic raised by various people. These are the documents published on 31 July https://www.gov.uk/government/consultations/33rd-seaward-licensing-round-appropriate-assessment
It is actually very narrow and not about whether the licencing generally should go ahead, but about the impact on wildlife etc and how risks can be mitigated.
The conclusions are fairly clear (from the third report listed, page 110):
"Taking account of the evidence and assessment presented above, it has been determined that the licensing of the 91 Blocks through the 33rd Licensing Round considered in this AA, will not have an adverse effect on the integrity of the relevant sites (identified in Section 1.3), and the Department have no objection to the NSTA awarding seaward licences (subject to meeting application requirements) covering those areas listed in Section 1.2."
I cannot see this being a show stopper, although I am sure the usual suspects will make objections...
In summary, if the licencing round is cancelled, it will not be because of this.
The deadline for comments on these reports is mid September, so presumably nothing will happen until then."