Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.
I'm looking for atleast £30million mcap..
Great news...not long now
Side track at BB by the looks if it..hence the delay for the rig.....Wellbore data for L99/03- 6Z Wellbore registration number Wellbore mechanical statusSubarea operator L99/03- 6ZDrilling KIMMERIDGE OIL & GAS LIMITED Licence number Wellbore intent Regulatory jurisdiction PEDL234 ExplorationLandward Wellbore type Operators wellbore name SidetrackBROADFORD BRIDGE-1 Quadrant Block No. Block suffix TQ2n/a Drilling sequence no. Slot number Platform letter 1n/an/a Primary target BB Spud date Date TD reached Regulatory completion date 29-JUL-2017Information unavailableInformation unavailable Datum type Datum elevation (ft) Kelly Bushing 99 Depth MD (ft) TVDSS (ft) 5662 The distance along the wellbore to the horizon intersection point. Measured from 109 (ft) above sea level 4100 The vertical distance between mean sea level and the horizon level Ground elevation (ft) Water depth (ft) 95 n/a
Until news starts to flow and asx listing....sp holding up well
Dl tweeted....not do.
No idea but do tweeted after the consolidations that the paperwork was in place so shouldn't be long...if it's in the next few weeks and the drill is going to lidsey next week (if reports are accurate)..4weeks to complete that's plenty of news to keep momentum up and hopefully the elusive ong approval for brockham as lidsey being drilled then we can prime the guns as lidsey is being drilled and jump straight to brockham...that should get the Aussies and the brits buying.
Yes pdub they will have drilling crew with the rig
Couldn't agree more wolf....it is my understanding we could have got alot more but only placed for the cash we need which can only be a good sign .bring on the revenue once ukog stop messing around with our rig
Plantman summer ends on 22nd of sept
Zzz zzz slow day I see judging on the posts and the snide comments
Ahh 4CER maybe relax a little.
Haha yep strange that
Sorry about the spelling mistakes I'm usually on the move when I post and dont have time to see what autocorrect has wrote. Lol
Yep the the schlumberger estimates for lidsey are 400bpd to 1500bpd..angis official prediction is a conservatives 400bpd...although vonk has said in interview they think it's somewhere inbetween...i have always said for the past year that lidsey could be the dor company maker...i am going for 1000bpd+ from the oolite. And 3000bpd from brockham (choked down)..as I think initial flow maybe higher..then imgani the respite from the kimmeridge at Lidsey are good and they side track that early next year from the l2 we get 30% of that...then more wells (3) are planned for brockham next year which could mean 1000s more bpd to us in the next 18months. Then octopus pads which is said in increase production around 8times.....buckle up people
During the glow in the dark days and always planned selling them at 6p..when the time came up sold half and to be honest made a good some of money....and let's be honest I was lucky ..feel really sorry for you guys who were left with nothing...they definitely screwed the PIs I just hope you can get some cash back.
They ya go mate doose77@gmail.com