Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.
Companies don't down tools due to the share price and the general market conditions. DMU
and the start of revenues are only 10weeks away.
http://www.smartercapital.co.uk/blog/aim-market-makers-short-selling-and-placings/
Ah forgot about the spare cash sitting in an ISA.
You can do a bed and sipp but doesn't that incur GCT. Throwing £178k into a personal pension will get tax relief so may offset it.
I thought the annual limit was £20k per per.
Price was 2.12
2 x 8.4m delayed trades just reported. 11:41:07 & 11:41:51 Not sure if today or yesterday.
The NEX exchange has the spread as 1.9 - 2.2 ADVFN have the spread as 2 - 2.1
It seems the 2.04 trades on both platforms are buys IMHO
Dmu
Carrying on with the Kellog's peat switch testing conversation. I wonder if the "currently negotiating off take agreements" for the excess biomass is with Kellogs?
Now that would be a WIN WIN.
Dmu
I read the RNS as REVENUES begin in Jan 2019. Approx 10 weeks away
From RNS......
The first installation will be at Lumberton in North Carolina. The plant will utilise some existing facilities and equipment currently owned by AEG at its site in Utah. The intention is to commence work immediately with the aim to have commercial production facilities installed by the end of Q4 2018. The installation will be assisted by the use of GRP's existing steam and drying capacity at its power plants. In addition, the JV will be able to take advantage of GRP's existing infrastructure for feedstock procurement. The JV intends to double the production of CoalSwitch at this facility to 10 tonnes per hour during H1 2019.
In addition the RNS states...
JV will leverage the significant synergies between GRP and AEG's businesses including GRP's established steam and drying infrastructure at its power plants and allow AEG access to its surplus biomass feedstock
and.....
GRP currently has access to fibre feedstock of up to 2 million tonnes per year, well in excess of its current internal consumption requirements. In addition, GRP has access to additional supplies of wood chips and process technology for the energy markets and is seeking with AEG through the JV to commercialise new revenue opportunities.
and....
AEG is currently negotiating off take agreements for the sales of both CoalSwitch and biomass sourced from existing GRP facilities.
Thanks for the heads up on that DrM
Totally agree MM, watched a frightening program on Discovery last night. Co2 Ppm is out if control from the 1950s https://goo.gl/images/ntAMT4
Looks like we are being held by 250k auto-bot trades on SETS. The time stamps seem very similar to the minute.
Any ideas anyone?
https://www.bbc.com/news/world-us-canada-45859325
How great is the climate threat?
The report released last week by the IPCC says climate change can only be stopped if the world makes major, and costly, changes.
That means reducing global emissions of CO2 by 45% from 2010 levels by 2030, and reducing coal use to almost zero and using up to seven million sq km (2.7m square miles) for land energy crops.
Exciting 3 months.....
AEGs exiting plant must be parked onsite by now as it was in-transit a few weeks ago. Pour a concrete base, put in a few services and erect.
The engineering for the additional 2 plants looks pretty straight forward. Mainly fabrication. No long lead time parts and long term servicing over lifespan will be easy and quick as they sit on mainland US.
Dmu
The TMS report will have to be re-written and will be very interesting reading.
Dmu
yep, report out next week
Gassed, well done on your post, looks like it pushed the vote in favour of AEG. Report out next week. Should be interesting reading.
Dmu
Gassed, voted last week and retweeted