RE: Predictions11 Feb 2019 21:17
I’m sure NVS will take the right balance between moving at speed and obtaining best possible outcome for the project, in my experience surest way to lose money on aim is to need to make x% by a certain time- makes people reckless and chasing the hype of pump and dump stocks.
Hopefully we’ll have a much clearer view on how the project will be developed in the next month or so. How much would a JV partner need to drill in how short a period and for how much of the project. Can the targets be spilt or do those all under the same licence have to stay together?
I’d also be keen to know how deep these deposits may be. Hopefully the aerial survey can give guidance on this, if anything like kalaba to date then cheap RC drilling to a few hundred metres could be done on scale relatively cheap to other projects having to drill at depth and wth diamond drills