Before sea trials commences a lot of the survey work will be carried out alongside the dock. This will have been ongoing throughout. As she is at a wet berth, and subsequently floating then a lot of the basics can be done alongside for Class Certification.
All paperwork and will be checked to ensure everything is in place and various State, Port and Class inspections will be ongoing, witnessed and signed off.
The actual putting to sea part to do final checks and tests shouldnt last too long as pretty much everything can be checked whilst alongside.
Im not sure what DP controllers she has fitted (i seem to recall Kongsberg from somewhere) so some testing will need to be complete if she is to be sailed back under her own steam as they need to ensure everything does what its supposed to do.
However, im not 100% if she will wait full FMEA testing of the DP controllers when back in Europort as they wont be needing the DP capability until just before going on station.