RE: IOG16 Jun 2023 13:36
MMMMmm, water from H2
in the last update
· The H1 well was shut in as planned during the final H2 HUC. Post-intervention, the plan remains to produce initially from H2 only, to flush formation water out of the Saturn Banks Pipeline System and reduce associated opex
· No faults or fractures were encountered in the H2 reservoir section and no formation water was observed on testing
· Following a period of shut in to allow the water levels to re-equilibrate, the plan is to reopen H1 periodically at lower rates to flow gas and condensate with limited water production
Water production was originally an issue, so may be further problems later, I dont know enough really to comment