RE: HE 12 Oct 2023 16:54
@Tro, But tweeting the BOP test will let us know they have started drilling to TD..
In an uncontrolled build up in pressure it is capable of cutting through the drilling pipe and sealing off the well.. So since they are installing one its needs to be tested before drilling for gas starts... 88e tested theirs after setting the surface casing(about 1000m), which I think maybe to about 70m in our case,....
Not even sure they had a BOP phase1, so maybe its over kill..
I believe the mud weight is the primary method to control pressure,