RE: Question on determining the size resource find.18 May 2021 19:21
@DeepblueDiver & SiesProcessor
luckily stumbled on the transcripts, as often not added..
Yes, I struggled looking at the table side ways, holding the side plank position, plus reading and taking notes was difficult.
Too stupid to rotate the screen, hindsight hey..I just forget these days..
oh, I see Gas not Helium, sorry, sometimes stuff does not register, well often, nightmare
From the table..
I worked out the recovery ratio as SRK 0.6364, Inseisive 0.7
then helium content SRK 0.03898, Inseisive 0.047
Then the big assumption, Porosity( i guess its porosity ?)
+Rukwas rift basin is 50kmx300km=50,000x300,000=15,000,000,000km^2
In this instance Assuming a 500m depth of Resource, volume =7,500,000,000,000 m^3
Assuming 100% Gas no rock,
7500000000000m^3=264860 bcf
+ Then using the given total OGIP P50 4842, to find the ratio..
I get 0.1828..
which is Seisprocessors posted ratio for porosity, no beer either, just lots of fresh air and mud today..
My task for tonight, will be structures..this sounds really really interesting(b&*^&*y exciting)..
The two targets at Tai are broad structural ones and not subtle stratigraphic ones, and they're not dependent on salt or seals in the lake bed sediments. Hopefully that's why they're termed 'must drill' targets!
Should be posted every morning "The two targets at Tai are broad structural not dependent on salt or seals in the lake bed sediments"