RE: Question EP14529 Jan 2019 00:05
Steak pie . Aussi in September
Synterra Technologies, the Calgary based geophysical service provider (“Synterra”) have provided the initial results from the Stage Two Seismic Reprocessing and Interpretation Study. The results show that existing local and regional seismic data is good quality. The interpretation confirms that the salt tectonic structuring can been seen in EP 145, as it can in the area where
Santos has announced it intends to drill the large Dukas prospect in the next six months. Mosman are working with Synterra to determine the future work program at EP 145, which may include additional seismic to fill in the data gaps with the objective of determining a drilling location, and presenting the full package of information to attract a farm-in partner.
EP 156 they said has been relenquished in the 9th nov update. So I wonder where we are at with these.. I regularly check Santos and Centsl petroleum website for there droll announcements or next steps. That’s the biggest drive of this company. They need to get seismics done by August 2019 and then a drill in 2020. So all depends on this Santos drill. GLA. No spuddy yet