RE: Rush for the Exits?7 Feb 2025 13:41
Fabulous grades for sure but it does make you wonder why a Tier 1 major initially jv'd in the project then decides to split their 50% with another Tier 1 major for 25% apiece, spend $10m on it, then the pair exit. I guess there must be more to it than just grades.
Anyway, back to Oriole.
The second hole at Mbe, of a 24 hole Maiden drilling programme, in virgin soil was a scissor hole. Scissor holes are designed to determine the optimal orientation or azimuth and establish the preferred angle, square-on/perpendicular-to the veins to achieve best results. Hole 2 proved to be the direction of choice making Hole 1 incidental. Hole 2 drilled to 197m has 15 intercepts (and/incl) for a total of 86.25m or 44% mineralisation starting at 5m. Grades ranging from cut-off (0.2g/t Au) to 3.57g/t Au. See core log photograph.
An excellent start.