New FEED Work Begun - 13 DEC 202313 Dec 2023 13:08
Consulting team begins FEED for Neptune Energy’s L10CCS carbon storage project in the Netherlands
Our consulting team has recently begun work on the front-end engineering design (FEED) on a project that aims to play a key role in supporting the European Union in reaching its decarbonisation goals.
The FEED, awarded to us by Neptune Energy, is for its L10 Operation facilities - a carbon storage infrastructure development that will connect to the Netherlands’ flagship Carbon Capture, Transportation and Storage (CCS) project, Aramis.
The L10 Operation is being developed by Neptune Energy, alongside its partners EBN, Tenaz Energy and ExxonMobil, and seeks to store up to five metric tonnes of carbon dioxide (CO2) annually, which will be captured from industrial emitters in the region.
Our scope covers the first two phases of the project, L10 South (1A) and L10 North (1B) and is being executed by our consulting team, based in Woking, UK:
Phase 1A: L10-South - installation of an L10 hub/injection platform in the L10 south storage complex and installation of a spur line from the Aramis DHUB (distribution hub) platform to the L10 hub platform
Phase 1B: L10-North - The installation of an injection platform (L10-Y) in the L10 north storage complex (L10-BE) and the installation of an inter-field pipeline between the L10 hub and injection platform
John Pearson, Chief Operating Officer, Energy Transition Projects commented: