RE: Holding Pattern Until - BREAKOUT!27 Mar 2024 09:42
ACCORDING TO BOAJYA INSPECTION "PETRO CHINA DACHIN TAMSAG" LLC HAS TRANSFERRED TO THE POLICE HEAD OFFICE AS IT WAS FOUND THAT CHEMICAL TOXIC AND DANGEROUS SUBSTANCE WITHOUT PERMISSION
Minister B of the Ministry of Internal Affairs. Bat-Erdene met with the managers of "Petrochaina dachin tamsag" LLC on November 2, 2023 and held a bilateral meeting on the issue of eliminating the negative effects and violations on the environment and gave a period of 3 months to eliminate 5 violations that occurred based on the seasonal conditions. According to the decision, the State Inspectors of the Department of Inspection of the Ministry of Internal Affairs worked and made the following conclusion.
REQUIREMENT-1: Improve the technology of household wastewater treatment plant, Environment of clean wastewater. The quality of the water. Wastewater General Requirements in compliance with standard MNS 4943:2015.
📌 EXTENSION: Technical design of Toson Uul XIX, Tamsag XXI area industrial base and household wastewater treatment plant in BhG has been completed by Erchimt urnul LLC and the renovation of the household wastewater Treatment Plant is planned to be completed in 2024.\n
REQUIREMENT-2: Work safety and hygiene. Warehouse of toxic chemicals and dangerous substances products. General requirement is to build an integrated storage warehouse of chemicals complying to MNS 6458:2014 standards and ensure safety during storage of toxic and hazardous substances.
📌 EXTENSION: Ta-2 or "Petrochaina Dachin Tamsag" LLC's chemical warehouse in the XXI area of the integrated facility has been extended by extending the fence to the northwest side of the integrated facility to build a 10 m wide, 21 m long, 4.5 m high, double-sided /dry, liquid/ warehouse in September of 2023. The environmental impact assessment has not been made for the warehouse.
REQUIREMENT-3: In accordance with the clause 2.3.9 of Article 2,3 of Article 2,3,9 of the "Environmental Impact Assessment Procedure" approved by the second amendment of the Government of Mongolia's Resolution 58 of the Mongolian Government, to add additional clarification to the detailed environmental impact assessment.
📌COMPLEMENTATION: At the meeting of the Professional Council on Environmental Impact Assessment of the Ministry of Environment and Tourism on December 08, 2023 the detailed environmental impact assessment of the Petrochaina dachin tamsag LLC's 21st area crude oil extraction project and decided to resolve specific problems and re-discuss them with 100 percent decision of the members, and return an. Also, the assessment report discussed at the conference did not include the chemicals for use in contracting companies.
REQUIREMENT-4 Sorting the waste from the activity, transferring household and liquid and hazardous waste to landfill of the subcontracting companies, clearing the waste from the non-purpose land
📌COMPLANATION: Large amount of waste created in an old quarry that was reconstructed along the