RE: Anticipation18 Jan 2020 17:01
15:33 Our best chance because;
Not all drills are equal, bit like key hole surgery, the external hole may be similar in size but not all operations are the same.
1) its not an unconventional science well drilled from a convenient spot (gravel pad) and based on historic 2D data.
2) Its not a conventional well, location calculated by OEL using 3D but utilising old style analysis (stoltes migration) and with no local well data to support decisions.
3)Charlie-1 is an appraisal of an existing discovery, with modern 3D commissioned by ourselves and utilising seismic inversion analysis, importantly PMO will have effectively double checked and confirmed that analysis.
Erik Opstad is vastly experienced and we have experience of NC3 Rig and probably have worked with a lot of the crew that will be operating the rig.
But ultimately what will be will be :-) stay appy.