Folk miss the pint3 Oct 2019 22:35
Once the rig was assembled with top drive the drill process didn’t take that long really. The new team will be quicker next time and we have the equipment we need. So lets go from one drill to the next with smaller flow rates 100 bopd + 250 next time, + 200 the next. All the time de-risking the project. Maybe add a second rig and have a go at the wild cats on our patch. It’s not get rich quick, but slow and steady with reducing risk.