RE: Estimate of resource1 Nov 2023 13:31
TaiA
Depth – 1,121m
Helium shows at five intervals in the Karoo Formation
Wire lined down to 880m
• No free gas in the uppermost thinly bedded Karoo sands (824-845m)
• Helium shows in the deeper and thicker sandstone units (not tested)
• Helium shows in the main Karoo reservoir (not tested)
TaiC
Original target depth - 1,100m
8.5” drill started at top of the Lake Bed Formation
• helium shows in Lake Bed Formation
• helium shows in Karoo Group
End October drill stopped at 1,445m (measured depth)
New basement target depth approximately 1,550m (proximity indicated by cuttings)