RE: Don`t Know About You Folks But ....14 May 2020 16:47
"No BG it never was intended to test the deeper Jurassic play."
yes Crusty, that s what I said and agree with you, it was not in the right location to test the Jurassic play unlike CH-1 is.
I'm not say they will or won't recomplete NT-2 what i'm saying, it is, or has been considered, and I have not seen yet officially, that the Ntorya development will not include the NT-2 work-over.
farm-out Circular page 59-60
https://tools.morningstar.co.uk/tsweu6nqxu/globaldocuments/document/documentHandler.ashx?DocumentId=229216175
5.7 " Development Cost Estimates The initial production scheme, Case A, is designed to produce from three wells with flowlines tied to a central manifold. Onward transmission to the Madimba plant is via a 18” line. This is expected to be supplemented by a further eight wells, Case B, to absorb the remaining plant ullage. Flow assurance has been assessed with no significant issues foreseen."
"Costs for the Case A, including pipeline, are fairly minimal at about $48 MM. The costs were provided by Ndovu and, on consultation with the provider, are said to include Indirect Costs (Design Engineering, Project Management, Insurances, etc.). RPS has allocated a contingency of 25% for unforeseen growth and possible construction issues. Total capex for the scheme is $60 MM."
"Drilling costs are again provided by Ndovu with 2 existing wells being re-completed at $4 MM each and one new vertical well at $15 MM. RPS has included a 15% contingency on these costs to give an overall drilling total of $26.5 MM"