RE: 88 Energy strikes oil at depth ahead of logging23 Mar 2022 20:13
Still plan on testing if the following statement is to believed,
The wireline logging program will consist of multiple runs that will include MDT for fluid sampling and flow potential measurements, side wall cores and image logs, and is expected to take approximately seven to ten days to complete.
A further update on the evaluation of the Merlin-2 results will be provided following completion of the wireline logging program, including with respect to “”further evaluation activities planning.””
The mud returns carry the data they have at the moment
Mud separates from the gas and cuttings via the mud separator and mud shakers
Clean the cuttings up and sample the gas then off to the lab.