Read between the lines folks..6 Aug 2018 14:31
All the signs is we are looking at a significant step change here...
Drill hole M2-041 is currently at 1,503 feet (458 metres). The last 200 feet (61 metres) of this vertical drill hole has intercepted intense hydrothermal alteration and mineralisation at the projected base of the M2-Sharktooth Dunlap caprock. The unexpectedly thick alteration and mineralisation, in the form of multiply-silicified, quartz-magnetite, hydrothermal breccia, appears to have taken the place of, or is very likely above, the copper and gold-bearing diorite. Drilling will continue through the hydrothermal breccia and is expected to then encounter the mineralised diorite intrusive