N Sands 21 days drill and log April2 Sep 2018 19:44
Quote, if to be believed, Pintadillo-1 will be a slightly deviated well, with a planned total measured depth of 8,448ft, and is expected to take approximately 21 days to drill and log.
If successful, the well will be tested and produced fluids delivered to the Platanillo facilities for export via the OBA system. In the event of a commercial discovery a second, deviated well will be drilled from the same pad to evaluate the accumulation. The Company is also evaluating the potential for a third well to be drilled horizontally, should the reservoir encountered be suitable for this technology. The Company believes horizontal drilling could significantly increase the drainage area, and production per-well. End - If It is horizontal, so there could be a delay as ML has gone for 28 Days, to be safe. I'm waiting on Ecu Intracampos 2018, Put 8 Sur Oriente New Stratus Energy TSX where the directors had to Loan the Tax loss shell $300k to keep going, one thing JW does well is the LONG GAME, played Put 14 well, no doubt frustrating other targets and his Fecking PI's & RH game of thrones, , but this could well work with Put 8 where they have their IPO - New Stratus Energy would have to truck oil in a Monsoon, and then CPO 5 where waiting helps in the longer term value with Indico, there are two more CPO 5 wells back to back for their ONGC Videsh IPO which might take a while. So bagging part of 4 CPO 5's 30% rather than 1 makes sense. We need Indico to spud soon. GLA. Expect N sands drilling results before the Interims. HNY
if all these come in HNY, then there are two more CPO 5 wells back to back for their ONGC Videsh IPO which might take a while.