RE: UKOG, Brent crude & the Bahamas.2 Jun 2020 13:04
09 March RNS "HH-2z clean-up operations are planned to continue over the coming week, after which essential maintenance and a planned upgrade of well test and production facilities will occur. These operations, designed primarily to enable simultaneous production from HH-1 and HH-2z, will require both HH-1 and HH-2z to be shut-in for a period of up to ten days.
Full extended well test operations with simultaneous multi-well production are planned to resume directly after the shut-in."