RE: It’s getting closer8 Jan 2024 22:34
From the last satellite photo on the 5th January it looks like the ponds are not filling up so fast compared with 10 days earlier .
The next image is due on the 10th let’s hope for a clear day.
Even though the situation from those images looks like the aquifer has been depressurised, that doesn’t mean to say they can continue with the Decline.
Shaun said they were going to complete the vent raises and drives, plus install the Evasee fan on the surface. There will also be blast curtains to install to direct stale air through the vents up to surface.
They’re possibly at the point where the air coming in through the Decline is insufficient and the fan needs installing.
It’s going to be a large fan but whether we will be able to see it from the satellite images I’m not so sure, the Sentinel one is not that detailed.
As far as the Byrnecut contract is concerned, there’s no guarantee yet that they will proceed at Havieron. Will NEM bring in their own preferred contractor ? I doubt it personally , it will be a big disruption , they’ve been at Telfer for years.
If they haven’t reached the base of the Permian cover by the end of their contract the Production Decline contract will take over and keep going down.
There will possibly be another contractor in place to construct the stoping infrastructure and start ore production but the venting infrastructure has to be in place and working by then before approvals can be obtained for ore extraction.
Going to be a busy 6 months and then get busier.